Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    aria2c Improper Certificate Validation – Research Advisory

    May 13, 2026

    PSIRT | FortiGuard Labs

    May 13, 2026

    Windows BitLocker zero-day gives access to protected drives, PoC released

    May 13, 2026
    Facebook X (Twitter) Instagram
    • Demos
    • Technology
    • Gaming
    • Buy Now
    Facebook X (Twitter) Instagram Pinterest Vimeo
    Canadian Cyber WatchCanadian Cyber Watch
    • Home
    • News
    • Alerts
    • Tips
    • Tools
    • Industry
    • Incidents
    • Events
    • Education
    Subscribe
    Canadian Cyber WatchCanadian Cyber Watch
    Home»News»University Claims Withholding Water From Nuclear Weapons Data Center Is ‘Unlawfully Discriminatory’ to Data Centers
    News

    University Claims Withholding Water From Nuclear Weapons Data Center Is ‘Unlawfully Discriminatory’ to Data Centers

    adminBy adminMay 8, 2026No Comments4 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    The University of Michigan has sent a legal threat over a yearlong pause that would prevent water hookup to a proposed nuclear weapons research and AI data center. Los Alamos National Laboratory and the University of Michigan are looking to build a $1.2 billion, 220,000 square foot data center in Ypsitlanti Township. On April 22, the Ypsilanti Community Utility Authority (YCUA) passed a 365-day moratorium on the delivery of water to hyperscale data centers in the area while it conducted environmental sustainability and long-term water use studies.

    As first reported by MLive, the University hand delivered and emailed a legal threat to the YCUA on April 21, the day before it was to vote on the proposed water moratorium. According to a copy of the letter obtained by 404 Media, the university feels the moratorium is “unlawfully discriminatory” against data centers and it promised to pursue “all rights and claims for relief” if its demands weren’t met.



    Luther Blackburn, YCUA’s executive director, told 404 Media that the organization had no comment on potential or pending litigation, but did confirm that he’d received a legal communication from the university.  “YCUA staff are working on a Request for Proposal to complete the investigations and studies outlined in the moratorium,” he said. “I believe YCUA has acted lawfully and in accordance with industry best practices by issuing the moratorium.”

    The university disagreed. “The University objects to any such sector-specific moratorium which would be legally invalid because, among other defects, it would be unrelated to any documented utility or public health needs,” the letter said, according to a copy obtained by 404 Media. “As a threshold matter, a moratorium on utility service is permissible only when linked to legitimate utility considerations such as documented capacity constraints, public health issues, or genuine financing challenges.”


    The University argued, citing various legal precedents, that the courts will not be on Ypsilanti’s  side and claimed that the area has plenty of water. “The record contains no evidence supporting any such YCUA capacity constraint,” the letter said. “To the contrary, YCUA’s leadership has publicly stated that serving the University’s proposed facility would not affect the authority’s ability to provide or treat water.”

    The letter quoted Blackburn as saying he had confirmed in 2025 that the data center’s proposed use of 200,000 gallons a day were within YCUA’s 8-10 million gallon per day capacity. “In addition, YCUA leadership has stated that serving the University’s project would likely help mitigate overall utility costs by improving efficiency and cost distribution,” the letter said.

    Sean Knapp, the YCUA’s director of service operations, told Planet Detroit last year that the YCUA is operating below capacity at the moment. “Adding the data center as a customer would help mitigate overall costs by improving efficiency and cost distribution,” he said at the time.

    After saying it was illegal for the Ypsilanti community to not give it water, the University claimed the moratorium discriminated against data centers. “Beyond the above legal deficiencies, the proposed moratorium is pretextual and unlawfully discriminatory because it singles out ‘data centers’ by label rather than by utility impact,” the letter said. “It is discriminatory to permit other users to connect and consume currently available capacity while the utility conducts undefined studies to determine whether there is sufficient capacity for the University’s proposed facility.”

    The University then asked the YCUA not to pass a moratorium and promised to “pursue” the matter. “The University respectfully requests that YCUA refuse to issue any sector-specific moratorium, instead basing any service decisions on documented utility factors, applied evenhandedly through existing permitting and technical review processes,” the letter said. “If these legal requirements are not followed by YCUA, the University reserves the right to pursue all rights and claims for necessary relief.”

    The University of Michigan did not return 404 Media’s request for comment.

    Ypsilanti Township has been fighting the proposed datacenter for more than a year now. Data centers are wildly unpopular in the United States. They often cause noise pollution, affect water quality, and drive up utility bills for their neighbors. Local opposition to the Ypsilanti Township data center has been compounded by its connection to America’s nuclear weapons industry.

    About the author

    Matthew Gault is a writer covering weird tech, nuclear war, and video games. He’s worked for Reuters, Motherboard, and the New York Times.

    Matthew Gault



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleDebian Postorius Important Cross-Site Scripting Issue Fixed DSA-6257-1
    Next Article Debian Trixie php8.4 Important SQL Injection Denial of Service DSA-6256-1
    admin
    • Website

    Related Posts

    News

    Windows BitLocker zero-day gives access to protected drives, PoC released

    May 13, 2026
    News

    War and Data Centers Are Driving Up the Cost of Fiber-Optic Cable

    May 13, 2026
    News

    InfoSec News Nuggets 05/13/2026

    May 13, 2026
    Add A Comment

    Comments are closed.

    Demo
    Top Posts

    Catchy & Intriguing

    March 17, 202674 Views

    Defending Canada’s Digital Frontier: Combating Phishing, Social Engineering, Ransomware, and Malware

    March 23, 202624 Views

    IP Address Investigations and Local OSINT

    March 20, 202624 Views
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    85
    Featured

    Pico 4 Review: Should You Actually Buy One Instead Of Quest 2?

    January 15, 2021 Featured
    8.1
    Uncategorized

    A Review of the Venus Optics Argus 18mm f/0.95 MFT APO Lens

    January 15, 2021 Uncategorized
    8.9
    Editor's Picks

    DJI Avata Review: Immersive FPV Flying For Drone Enthusiasts

    January 15, 2021 Editor's Picks

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Demo
    Most Popular

    Catchy & Intriguing

    March 17, 202674 Views

    Defending Canada’s Digital Frontier: Combating Phishing, Social Engineering, Ransomware, and Malware

    March 23, 202624 Views

    IP Address Investigations and Local OSINT

    March 20, 202624 Views
    Our Picks

    aria2c Improper Certificate Validation – Research Advisory

    May 13, 2026

    PSIRT | FortiGuard Labs

    May 13, 2026

    Windows BitLocker zero-day gives access to protected drives, PoC released

    May 13, 2026

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter) Instagram Pinterest
    • Home
    • Technology
    • Gaming
    • Phones
    • Buy Now
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.